Do I need to increase my Ventilation rates and if so by how much?

Time the ventilation system to start at nominal speed at least two hours before the building starts being used. Then switch to lower speed two hours after the building stops being used. This is as per guidance in BESA VG002 V4 https://www.thebesa.com/media/837990/besa-guidance-vg002-v4.pdf