


After some 20 years in its two storey building in Malvern, Worcestershire, Sierra CP Engineering decided to modernise its heating and lighting systems to save energy and provide more comfortable year-round working conditions for its 50-strong staff.
The purpose-built premises property was developed in the 1990s when energy efficiency and thermal performance of buildings were lesser concerns. The building could become unbearably hot in summer while in winter the electric heaters, rated at 2kW, took a long time to raise temperatures adequately. After the Christmas shut-down it took several days to get the building comfortably warm.
R32 technology brings cost-saving comfort to engineering staff
The 20 outdated, inefficient and energy-hungry electric panel heaters have gone. The boardroom, offices and specialist workshops now have heating – and cooling – provided by 19 split air conditioning systems from Daikin UK’s Bluevolution range, with the latest R32 refrigerant technology. The systems are controlled by infra-red controllers, giving people the freedom to select temperatures. Installer Wayne Young of Malvern-based Daikin D1 Partner Young Air Conditioning, says the choice of systems was motivated by a preference for the R32 technology. Sierra CP received a grant towards the project from The Business Energy Efficiency Programme, funded from the European Regional Development Fund
Peter Martin, Financial Controller
Peter Martin says “The Daikin systems are five times more efficient and the prospect of reduced cost energy for heating – plus the benefit of having comfort cooling available in hotter weather – was very attractive. We are expecting significant energy cost savings. The improved quality of the workspace is an enormous benefit to the company and staff. We use our boardroom extensively for training sessions and before the Daikin systems, conditions could become very unpleasant. It’s much more comfortable now.”
Improved quality of the work space
All the systems have ultra-quiet FTXM-M wall mounted indoor units with Daikin’s Flash Streamer technology, which ensures fresher, cleaner air.

Learn more
-
CP Sierra Engineering case study.inddPDF | 277.94KB
Other case studies
-
CP Sierra Engineering
-
Lansdowne Road
-
Wensum Place, Bromley
-
Office Premises in Malvern
-
Oxford Brookes University
-
Carlton Club, Portsmouth
-
Uttoxeter Racecourse
-
60 Grays Inn Road
-
Handelsbanken Halifax Branch
-
Bang and Olufsen
-
Hafod Caves
-
K-Way
-
Citadines Hotel, Barbican
-
Coventry University Technology Park
-
Astor House
-
Albany House
-
Refrigerant removal Bristol Waters
-
Architectural heritage site
-
Ascent Farnborough
-
Croakers Hatch
-
Denstone Hall Farm
-
Hyde Park Gardens
-
West Thames College
-
Wilton Row Project
-
Lush Store, Edinburgh
-
Holiday Inn Express
-
Kings Park Village
-
Weir House, Bristol
-
The Boston Mayflower
-
Cawsand Bay
-
Kew Road
-
Best Western Moores Hotel, Guernsey
-
Halcyon Medical
-
Grand Central Hotel Northern Ireland
-
Dale Amateur Boxing Club
-
David Lloyd Beaconsfield
-
Grand Hotel York
-
Great Eastern Street Hotel
-
Royal Marsden
-
Taper Studios London
-
St George's Kew
-
The Jungle
-
Pomme d'Or Hotel
-
Japan House, Kensington
-
Homefield Grange Spa
-
Hotel Refurb Central London
-
Yorkshire Hotel
-
Coral Hatfield
-
Citadines Hotel
-
Crowne Plaza, Basingstoke
-
Montcalm Hotel
-
London Bank
-
Leon restaurant
-
Velocity office building
-
40 Clarendon Road
-
Electricity North West
-
Providing cooling for the High-Luminosity LHC project at CERN
-
Supplying a hospital with an efficient, reliable, and compact solution
-
Providing a cooling solution for an office building in the UAE
-
Blakes Farm, West Sussex
-
Chester Hotel, Aberdeen
-
BrewDog Hotel
-
British Airways i360
-
Dean Clough Mill
-
The Bloomsbury Hotel
-
Portcullis House
-
The Salthouse Hotel, Northern Ireland
-
The Warrington Family, Swinton
-
The Croke Family, Guildford Case Study
-
Classic Cottage, Cornwall
-
Merlin Housing
-
Supplying a complete HVAC system for an office building
-
Naturkost Brinkman
-
Hotel Santos Porta Fira
-
Action reclaimed refrigerant allocation
-
Perial Asset Management
-
JBC
-
Prezzemolo & Vitale - Palermo
-
Thirteen Group
-
Ashcraig, Scotland
-
Engineer’s quest for efficiency and comfort proves a real game-changer
-
Bennachie Hills, Aberdeen
-
Beaumont Court
-
Historic Cornish Cottage
-
Training Centre Belgium
-
Sound enclosure case study in Flassy
-
DIY SOS: Treetops Charity
-
Smith and Wollensky